LEACH – HUDDERSFIELD

We were approached by Leach because they were at the end of a tenancy and were required to  recoat the floor as per their lease agreement. They were on a time crucial deadline and required the floor to be completed as soon as possible.

We gave Leach 2 options on their floor, option 1 was to grind the floor and apply single pack epoxy and option 2 was for 2 coats of High Build.

They went for the second option as they did not want to run the risk of the single pack coming up as soon as the next tenant moved in and being chased by the landlord.

The job was completed in 3 days

We have been informed that the landlord was so happy with the floor it has now been written in all their property contacts that we must do the floor coating and the end of each tenancy.