DISCOVER OUR
LATEST CASE STUDIES
![]()
40+ YEARS DELIVERING INDUSTRIAL FLOORING SOLUTIONS ACROSS THE UK
![]()
FREE NO OBLIGATION
SURVEY, CONSULTATION & QUOTE
![]()
WE MANAGE IT ALL
FROM CONSULTATION TO COMPLETION
![]()
READ OUR LATEST CASE STUDIES
Please read our case studies to learn more about our process or to gain inspiration for your own project.
No posts
ALFRED HYMAS
ALFRED HYMAS Alfred Hymas was told by the highways agency that they needed to get their MOT area up to standards. Stewart from Alfred contacted us requesting a quotation and
B PRICE OXFORD
B PRICE, OXFORD Scope of works: Erect tubular scaffolding to the building Prepare and decorate all metal railings/balustrades/handrails to the entire demise. Clean down, prepare and decorate all windows and
GO OUTDOORS, PENRITH
GO OUTDOORS, PENRITH October 2017 We have a long relationship with Go Outdoors, this project is just one of many we have completed for them over the years. The duration
CANNING TOWN, LONDON
CANNING TOWN, LONDON This was yet another contract we did for B Price, this consisted of the external repainting to 14 units on a trading estate. The project ran over
AMARO GROUP
AMARO GROUP – Anti Slip Flooring At first when we was approached by Dean at Amaro he requested a grey anti slip floor with Green gangways for his warehouse which
CHERRY COURT, LONDON
CHERRY COURT, LONDON August 2017 Cherry Court is another project we completed for B Price, the duration was two weeks with a contract value of £20,306.00 We were required to re-paint
SLUZER PUMPS – MIDDLESBROUGH
SLUZER PUMPS – MIDDLESBROUGH 520m2 of floor coating and 536lm of demarcation Sluzer reached out to us with a request to rejuvenate their aging walkways. These pedestrian gangways had seen
ENDOLINE BIGGLESWADE
ENDOLINE BIGGLESWADE 111m2 of floor coating and 167lm of demarcation Endoline approached us, they were looking at getting some walkways installed in their warehouse The floor had never been coated
EREWASH – DERBY
EREWASH – DERBY 576m2 anti slip floor This is a Motor Vehicle Engineers workshop. Our brief is to prepare and paint the floors, install floor markings and a pedestrian gangway.
FABFLEX – NOTTINGHAM
FABFLEX – NOTTINGHAM 2460m2 Fabflex were at the end of its tenancy in this unit and as part of their agreement they were required to recoat the floor. There was
GO OUTDOORS
GO OUTDOORS Gloucester, 17th May 2017 Scope of works: Car park marking: To supply and apply hot thermoplastic road marking material and tack coat concrete primer where necessary. .100 x
SANGAM PANEER MANUFACTURING LIMITED
SANGAM PANEER MANUFACTURING LIMITED – LEICESTER 381m2 The production facility featured an aging resin flooring system. Despite its wear, it remained in good condition with effective drainage leading to the
ACTON CONSTRUCTION & STEM CENTRE
ACTON CONSTRUCTION & STEM CENTRE We completed this project during the Christmas shut down to cause minimum disruption to the college and reduce the risk of students and other members
SHAPES – OXON
SHAPES – OXON 368m2 Shapes reached out to us with a request to revamp their warehouse floor and install gangways to enhance safety for their staff. We kicked off the
JOHN LEWIS DISTRIBUTION CENTRE, MILTON KEYNES
JOHN LEWIS DISTRIBUTION CENTRE, MILTON KEYNES We were contracted by John Lewis to coat the flooring in their warehouse, this was one of the largest floors we have coated at
LEACH – HUDDERSFIELD
LEACH – HUDDERSFIELD We were approached by Leach because they were at the end of a tenancy and were required to recoat the floor as per their lease agreement. They
LONDON AND SCOTTISH PROPERTY
LONDON AND SCOTTISH PROPERTY NORFOLK HOUSE, BIRMINGHAM NOVEMBER 2017 Scope of works: Floor Preparation: Floor preparation such as shot blasting is done so the resin or screed product can be
WALLWORKS – CAMBRIDGESHIRE
WALLWORKS – CAMBRIDGESHIRE We were approached by Wallworks who required the factory floor coated in an anti-slip coating. The floor was very badly worn, there were some sections that had
NORFOLK HOUSE – BIRMINGHAM
NORFOLK HOUSE – BIRMINGHAM November 2017 We were approached by London and Scottish Properties who required the loading bay floor of Norfolk House to re coated. The contract value of
SELWOOD – EASTLEIGH
SELWOOD – EASTLEIGH 1575m2 Selwood reached out to us, expressing frustration with their worn and damaged floor coating. We suggested our anti-slip system, which is not only durable but also
SKILLFIX CONSTRUCTION – REDDITCH
SKILLFIX CONSTRUCTION – REDDITCH 2526m2 Richard from Skillfix reached out to us regarding a renovation project in Redditch. With a pressing deadline to meet, we provided him with a quotation
NOT SURE ON THE BEST SOLUTION FOR YOU?
GET IN TOUCH WITH US TODAY FOR A FREE, NO OBLIGATION CONSULTATION, SURVEY AND QUOTE